Under certain circumstances (described below) if you issue a book from a reserve list, the due date of the book might be before the issue date.
We have confirmed a report that due dates may not calculate correctly for books issued from reserve lists. In the example confirmed, the due date was a date at the end of the previous year.
The bug consists of a particular internal value not being updated at the correct time.
After starting Athenaeum Pro, simply issue at least one book in the normal manner, before issuing from reserve lists.
This problem manifests it self under the following circumstances:
The administrator can go directly to the circulation and amend the due dates manually. If there are a large number of books, then the replace function (see note 9) can be used to adjust the dates in one step. Replace can set all items of a found set to a single value (say "24/3/2001") or to a calculated value such as the issue date plus 2 weeks (circ_issueDate + 14).
A permanent fix is included Athenaeum Pro 4.5.3.